The Three Gates

Fabrication never begins without three things.

  1. An approved door sample.
  2. Signed shop drawings.
  3. The deposit.

Why: it protects the schedule. A project that clears the gates doesn't stall in the shop, and a finish approved on a physical sample doesn't get argued about at install.

Lead Times

Quoted by project size. Held.

Lead times by project size
Under $50K 6–8 weeks
$50–100K 8–10 weeks
$100K+ 10+ weeks

Measured from the day the third gate clears.

How We Communicate

Problems are flagged early, with a fix attached.

The GC always knows status without asking. If a slab is backordered or a site condition changes the drawings, you hear it from us first — with the revised plan, not just the problem.